Users

All Posts (3)

avatar

jonatanencarnacion

Scheduled jobs drop from the scheduler needing a reload of the configuration file

avatar
avatar
avatar

The two scheduled definitions are as follow:

New-PSUSchedule -Cron "*/15 * * * *" -Script "PATH\Generic Script One Name.ps1" -TimeZone "US/Central" -Name "Generic Script One"

New-PSUSchedule -Cron "00 6 15 2,5,8,11 *" -Script "PATH\Generic Script Two Name.ps1" -TimeZone "US/Central" -Name "Generic Script Two"

I should mention here that we have other scheduled scripts following this same format and for the most part, we do not notice those being dropped.

Answer to questions:

-Every node is running 2026.2.2

-We have 3 nodes

-Every node has an independent local repository clone

-All nodes are configured one way

-This one I cannot fully confirm to be honest, but I can say that it looks like it disappears from every node

I will post a follow up when it happens again, it seems to be dropping weekly or every two weeks right now

Thanks

Scheduled jobs drop from the scheduler needing a reload of the configuration file

avatar
avatar
avatar

Hello Ruben,

-We are currently on 2026.2.2 but this has been happening with every version since we upgraded from PSU 4 to PSU 5 - Current Revision number: {12DE80BD-7AF5-46C7-8375-B178974C8BC4}

-MSI installation type

-Multi-Node

-MSSQL

-For the most part yes. Honestly do not know if other scripts get affected as they are not as high priority as these two.

-It does not. That is when we first noticed that it "drops" from the schedule

-Yes they are still on the schedules.ps1 file

-No next execution is visible as the script "drops" completely until a reload happens and then the next execution shows the next time as normal

-I am not clear on what you are asking in this part: Sanitized definitions of the affected schedules, including their schedule expressions and environments.

-the scheduled is created by updating the schedules.ps1 file. Not created directly through the admin console.

-We have git sync that syncs our repository between the various nodes. Nothing else modifies the files.

Scheduled jobs drop from the scheduler needing a reload of the configuration file

avatar
avatar
avatar

I have many scheduled jobs that run smoothly without any issues but I am noticing that two of them randomly get dropped from the scheduler. The fix is that I just have to reload the configuration file from the File tab (so no changes to the files). Then rinse and repeat like a week later. I don't catch these until users tell me that they are not getting some of the expected reports. Has anyone encountered this and found a fix? Thanks

1 - 3 of 3 items